The lofting device is officially reinstalled and ready to roll. It took me most of the day, but it will be worth it. I spent the morning redoing all the mounts that Luke and I toiled over last night. Hopefully, you won't be reading this, Luke, but, if you do, I am sorry. Ben showed up at about 10:30 and worked most of the day on sliding legs for our I-beam table. We had lunch at the airport down the street and saw some exciting ACC Tournament action in the afternoon while we were working, including a last-second game-winner from Tyler Hansbrough. I took some time to reinforce the lofting arm to remove any compliance that it had accumulated after the long body mold sculpting process. After dinner, I came back out, strung the wire and reset the center for the lofter.
Saturday, March 15, 2008
15 Mar 08
The lofting device is officially reinstalled and ready to roll. It took me most of the day, but it will be worth it. I spent the morning redoing all the mounts that Luke and I toiled over last night. Hopefully, you won't be reading this, Luke, but, if you do, I am sorry. Ben showed up at about 10:30 and worked most of the day on sliding legs for our I-beam table. We had lunch at the airport down the street and saw some exciting ACC Tournament action in the afternoon while we were working, including a last-second game-winner from Tyler Hansbrough. I took some time to reinforce the lofting arm to remove any compliance that it had accumulated after the long body mold sculpting process. After dinner, I came back out, strung the wire and reset the center for the lofter.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment