Hunt and I spent most of the day wiring the table, a task that turned out to be more tedious than previously anticipated. We ran aluminum conduit to each electrical box and connected everything in a centralized box. The tough part was the fact that we were essentially working on a ceiling that was about 3 feet off the ground. The shoulders are a little sore. We also got the blue room looking much cleaner and nicer. We made a run to the Home Depot to get a load of plywood to make doors from the new shop with tomorrow. Ben and Zac spent most of their morning making a run to the dump and the rest of the day stickering a huge load of backer that we picked up from our buddies at Atlantic Veneer a week or so ago. Aaron is really cranking out the renderings, which are exciting to see. Tomorrow, we will commence chassis work.